Institutional/Governmental
Goodwill / Easter Seals of Minnesota
- Location:
- St. Paul, MN
- Type:
- Design/Build, Remodel
- Size:
- N/A
Electrical renovation of the entire facility into new headquarters for Goodwill/Easter Seals, Warehouse and Retail facility.
City of Blair Water Treatment Facility
- Location:
- Blair, WI
- Type:
- Construction of new water treatment facility modifications to existing facilities
- Size:
- N/A
This project includes a new water treatment facility with high service pumps, an aerator, chemical treatment, filtration, process controls, and a 230KW standby generator. In addition to wiring these systems in the new building NEI also did the power, process and control wiring for a new lift station, and modifications in two existing pump houses. As part of this project a new SCADA system was installed in the control room of the new treatment plant. This system has several remote sites including two elevated reservoirs, two wells, and three lift stations.
Hammond Army Reserve Center
- Location:
- Hammond, WI
- Type:
- New Construction
- Size:
- 26,000 square feet
New Army Reserve Training Center; general electrical, lightning protection, cathodic protection, Security, Fire Alarm, Voice/Data, and Area Evacuation System.