Fleet Farm Distribution Center

New construction of 1,125,000 square foot warehouse with backup generator within a short 9-month schedule.

Bill's Distributing

New state-of-the-art distributor including energy efficient automatically controlled lighting throughout, including drive-thru truck bay, refrigerated warehouse, offices, conference rooms, and a large meeting room with a training bar and kitchen.

Max Phillips & Sons / Alter Trading Corp

NEI coordinated the electrical requirements of several equipment vendors to successfully build a car/metal shredding and sorting plant. We installed a 600 amp 12,500 volt electrical service to power (2) 2,000 hp DC motors along with an additional 1,500 hp in associated motors. In addition to the power wiring NEI did the process control wiring in this plant that sorts ferrus and non-ferrus metals by type.

Waste Management Timberline Trail

Installation of four (4) Caterpillar Methane Generators totalling 3.2 Megawatts of Power.