Educational
Connect with the Best, Connect with NEI Electric, Today!
Adam's Spanish Immersion School
- Location:
- St. Paul, MN
- Type:
- Plan & Spec, Remodel & Addition
- Size:
- 95,575 square feet
![st-croix](https://neielectric.com/wp-content/uploads/st-croix.jpg)
![st-croix-1](https://neielectric.com/wp-content/uploads/st-croix-1.jpg)
![st-croix-2](https://neielectric.com/wp-content/uploads/st-croix-2.jpg)
![st-croix-3](https://neielectric.com/wp-content/uploads/st-croix-3.jpg)
![st-croix-4](https://neielectric.com/wp-content/uploads/st-croix-4.jpg)
![st-croix-5](https://neielectric.com/wp-content/uploads/st-croix-5.jpg)
![st-croix-6](https://neielectric.com/wp-content/uploads/st-croix-6.jpg)
![st-croix-7](https://neielectric.com/wp-content/uploads/st-croix-7.jpg)
This phased project went through two summers and two school years. Phase 1 was a 2-story addition to the west and a 4-story addition to the north. Phases 2-4 were a complete remodel of the remaining school. Everything from the main service throughout the building was replaced with new electrical equipment/fixtures. The #1 priority with this project was that the students and staff were able to operate on their normal schedule in a safe and secure building separate from the construction zones.
Unity School, WI
- Location:
- Balsam Lake, WI
- Type:
- Design Build
- Size:
- 120,000 square feet
![unity-school-0](https://neielectric.com/wp-content/uploads/unity-school-0.jpg)
![unity-school-1](https://neielectric.com/wp-content/uploads/unity-school-1.jpg)
![unity-school-2](https://neielectric.com/wp-content/uploads/unity-school-2.jpg)
![unity-school-3](https://neielectric.com/wp-content/uploads/unity-school-3.jpg)
![unity-school-4](https://neielectric.com/wp-content/uploads/unity-school-4.jpg)
![unity-school-5](https://neielectric.com/wp-content/uploads/unity-school-5.jpg)
![unity-school-6](https://neielectric.com/wp-content/uploads/unity-school-6.jpg)
New addition and remodeling of Auditorium, Gymnasium, Weight Room, Cafeteria, Classrooms and hallways – electrical and installation of new lighting, fire alarm system, audio/visual and security.
Saint Agnes School
- Location:
- St. Paul, MN
- Type:
- Design/Build, New Addition
- Size:
- 37,059 square feet
![saint-agnes-1](https://neielectric.com/wp-content/uploads/saint-agnes-1.jpg)
![saint-agnes-2](https://neielectric.com/wp-content/uploads/saint-agnes-2.jpg)
![saint-agnes-3](https://neielectric.com/wp-content/uploads/saint-agnes-3.jpg)
This project started with the demolition of Bandas Hall which included the relocation of the existing utility service and the creation of a new electrical service. The existing electrical service was updated and refed from the new service. We worked with the Owner as a Design/Build Electrical Contractor to complete their new building called the Ubel Athletic Center (UAC). The UAC includes Bandas Gym and locker rooms, new Main Office, Music & Vocal Classrooms, additional Classrooms, a grand Commons Area and a shell space for a future Auditorium.
St. Croix Falls Elementary School
- Location:
- St. Croix Falls Elementary School
- Type:
- Addition and Remodel
- Size:
- 106,000 square feet
![st-croix-falls](https://neielectric.com/wp-content/uploads/st-croix-falls.jpg)
![st-croix-falls-1](https://neielectric.com/wp-content/uploads/st-croix-falls-1.jpg)
![st-croix-falls-2](https://neielectric.com/wp-content/uploads/st-croix-falls-2.jpg)
NEI was the successful electrical contractor for a 40,000 square foot addition and 30,000 square foot extensive remodel. This included a gymatorium, 25+ classrooms for K-4 students, Media Center, and a new kitchen. Electrical services performed include Interior and Exterior Site lighting with total facility lighting control, new 1600 amp 277/480 volt service, Fire Alarm, and complete rough-in for all low voltage systems.