Street Lighting/Parking Garages
United Hospital Gold Parking Ramp
- Location:
- St. Paul, MN
- Type:
- Design Assist, New Construction
- Size:
- N/A
A 6-story ramp was erected and then 2 additional floors of parking were added to the existing 4-story parking ramp. The exercise area was a tenant build out that provides health training for past patients.
Ramsey Municipal Parking Ramp
- Location:
- Ramsey, MN
- Type:
- Plan/Spec, New Construction
- Size:
- 216,000 square feet
Construction of a new 4-story parking ramp.
Hwy 63
- Location:
- Baldwin, WI
- Type:
- Street lighting and traffic signals
- Size:
- N/A
As part of the upgrade to Hwy 63 in Baldwin, NEI completed the electrical portion. This included temporary traffic signals, two intersections with new traffic signals, modifications to traffic signals at third intersection, fiber optic interconnection of traffic signals, and street lighting.