Minnesota

Children's of MN Administration Building

Project Summary

NEI Electric led the design/build process for the 200,000-square-foot Children’s Minnesota Administrative Building, enhancing the facility’s electrical infrastructure to support critical operations and future growth. NEI Electric’s leadership and expertise in electrical design/build services transformed Children’s Minnesota Administrative Building into a reliable, efficient hub that supports its essential services with confidence and precision.

Service Upgrades:

Modernized the electrical service to improve reliability and scalability for expanding operational demands.

Enhanced Lighting Solutions:

Installed energy-efficient LED lighting systems to reduce operational costs, improve workspace productivity, and deliver consistent illumination throughout the facility.

Advanced Fire Alarm System:

Integrated a voice evacuation fire alarm system, ensuring occupant safety and adherence to modern fire codes.

UPS Power Distribution:

Engineered and installed a robust UPS system to safeguard critical network infrastructure and ensure seamless operational continuity.

BIM Coordination:

Leveraged Building Information Modeling (BIM) to streamline the design and installation process, delivering accurate and efficient results.

Project Details
No items found.