NEI Electric provided electrical services for the construction of a new water treatment facility, spanning approximately 5,000 to 7,500 square feet, and the modernization of existing systems in Blair, WI. This facility includes advanced control systems and seamless integration with existing infrastructure to support efficient water treatment and distribution. NEI Electric’s expertise in utility projects ensured the delivery of a highly efficient and reliable water treatment facility, empowering the City of Blair to provide clean water to its residents while optimizing operational performance.
Installed electrical systems for high-service pumps, chemical treatment, filtration, and a 230KW standby generator to ensure reliable and uninterrupted operations.
Implemented a cutting-edge SCADA system for real-time monitoring and remote management of the treatment plant, lift stations, wells, and reservoirs, ensuring optimized system performance.
Upgraded existing pump houses and wired a new lift station to enhance the city’s water distribution capabilities while integrating with the new facility.
NEI provides comprehensive electrical services for a range of industries, from healthcare facilities and manufacturing plants, to retail giants and corporate offices.